<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>CapRock Archives - VRJ Properties</title>
	<atom:link href="https://vrjproperties.com/tag/caprock/feed/" rel="self" type="application/rss+xml" />
	<link>https://vrjproperties.com/tag/caprock/</link>
	<description>Multifamily and Commercial Real Estate Investments</description>
	<lastBuildDate>Sun, 21 Jan 2024 21:27:56 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://vrjproperties.com/wp-content/uploads/cropped-favicon-512x512-1-32x32.png</url>
	<title>CapRock Archives - VRJ Properties</title>
	<link>https://vrjproperties.com/tag/caprock/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>CapRock Moves Ahead of Schedule on 1.3M-SF Spec Industrial</title>
		<link>https://vrjproperties.com/caprock-moves-ahead-of-schedule-on-1-3m-sf-spec-industrial/</link>
		
		<dc:creator><![CDATA[VRJwebmaster]]></dc:creator>
		<pubDate>Fri, 19 Jan 2024 23:37:11 +0000</pubDate>
				<category><![CDATA[Industrial]]></category>
		<category><![CDATA[Interest Rates]]></category>
		<category><![CDATA[1.3MSF]]></category>
		<category><![CDATA[Ahead]]></category>
		<category><![CDATA[CapRock]]></category>
		<category><![CDATA[Moves]]></category>
		<category><![CDATA[Schedule]]></category>
		<category><![CDATA[Spec]]></category>
		<guid isPermaLink="false">https://vrjproperties.com/caprock-moves-ahead-of-schedule-on-1-3m-sf-spec-industrial/</guid>

					<description><![CDATA[<p>CapRock Partners said Building 1 at CapRock Central Point III in Visalia has completed the tilting of the building’s concrete panel walls, forming its exterior structural shape. Moving ahead of its original development timeline, Building 1 is now slated for completion in summer 2024....</p>
<p>The post <a href="https://vrjproperties.com/caprock-moves-ahead-of-schedule-on-1-3m-sf-spec-industrial/">CapRock Moves Ahead of Schedule on 1.3M-SF Spec Industrial</a> appeared first on <a href="https://vrjproperties.com">VRJ Properties</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p> <br />
</p>
<div>
<p>CapRock Partners said Building 1 at CapRock Central Point III in Visalia has completed the tilting of the building’s concrete panel walls, forming its exterior structural shape. Moving ahead of its original development timeline, Building 1 is now slated for completion in summer 2024. </p>
<p>The 1,270,750-square-foot, Class A speculative logistics and distribution facility encompasses approximately 75 acres within the four-building CapRock Central Point III, which is a part of CapRock’s larger five-million-square-foot Central Point masterplan.</p>
<p>“Building 1’s concrete walls are now tilted and the roof structure started, revealing the true magnitude and scale of CapRock Central Point III, and signifying Visalia’s rising importance as a critical distribution and logistics hub in the West,” said Bob O’Neill, SVP, acquisitions at CapRock Partners. “Designed to serve Fortune 100 corporations seeking a state-of-the-art industrial complex accessible to a large percentage of the West Coast’s population, CapRock Central Point III is drawing interest from leaders in logistics as well as food processing and manufacturing.”</p>
<p>JLL’s Mike Fowler, Mike McCrary and Mac Hewett lead the leasing efforts for CapRock Central Point III.</p>
<p><em>Connect Industrial Midwest 2024 will take place on March 5, 2024, at Joe’s Live in Rosemont, Illinois. <a href="http://www.connectindustrialmidwest2024.com/"><strong>Click here</strong> </a>for more information and to register.</em></p>
</div>
<p><br />
<br /><a href="https://www.connectcre.com/stories/caprock-moves-ahead-of-schedule-on-1-3m-sf-spec-industrial/">Source link </a></p>
<p>The post <a href="https://vrjproperties.com/caprock-moves-ahead-of-schedule-on-1-3m-sf-spec-industrial/">CapRock Moves Ahead of Schedule on 1.3M-SF Spec Industrial</a> appeared first on <a href="https://vrjproperties.com">VRJ Properties</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
